7-Day Rongai Route the Quiet Side of Kilimanjaro

7-Day Rongai Route the Quiet Side of Kilimanjaro

Offered by: USD Safaris & Tours
4.9/5 (1600 Reviews)
Journey Snapshot
🗺 Tanzania ⏱ 7 days 🚙 4x4 Pop-up Roof
Rongai Route
The Rongai Route offers a unique adventure, approaching Mount Kilimanjaro from the north near the Kenyan border. Known for its quiet trails and pristine wilderness, it’s perfect for trekkers seeking solitude and stunning views. Ideal during the rainy season, this 6–7 day trek provides a remote and rewarding climb through untouched landscapes, joining the Marangu Route at Kibo Camp before descending. A moderately challenging and unforgettable journey!

Route

Start Rongai Route (Day 1)
Day 2 Rongai Gate(1950m) to 1st Caves Camp(2600m)
Day 3 1st Camp Caves to Kikelewa Cave(3600m)
Day 4 Kikelewa Cave to Mawenzi Tarn Camp
Day 5 Mawenzi Tarn Camp to Kibo Hut(4700m)
Day 6 Summit Attempt
Day 7 Horombo Hut to Marangu Gate
End Rongai Route

Tour Features

Day 1: Pick Up from the Airport Day 2: Rongai Gate(1950m) to 1st Caves Camp(2600m) Day 3: 1st Camp Caves to Kikelewa Cave(3600m) Day 4: Kikelewa Cave to Mawenzi Tarn Camp Day 5: Mawenzi Tarn Camp to Kibo Hut(4700m) Day 6: Summit Attempt Day 7: Horombo Hut to Marangu Gate

Activities & Transportation

  • Route: Rongai Route
  • Duration: 7 days
  • Getting around: 4x4 safari vehicle (pop-up roof)
  • Transfers: airport pick-up & drop-off can be included

Accommodation & Meals

Day
Accommodation
Meals
1
Budget camping On Mt Kilimanjaro
All meals included Drinking water (Other drinks not included)
2
Budget camping On Mt Kilimanjaro
All meals included Drinking water (Other drinks not included)
3
Budget camping On Mt Kilimanjaro
All meals included Drinking water (Other drinks not included)
4
Budget camping On Mt Kilimanjaro
All meals included Drinking water (Other drinks not included)
5
Budget camping On Mt Kilimanjaro
All meals included Drinking water (Other drinks not included)
6
Budget camping On Mt Kilimanjaro
All meals included Drinking water (Other drinks not included)
7
No accommodation (End of tour)
Breakfast & lunch (Dinner not included) Drinking water (Other drinks not included)

Day by Day

Day 1 Pick Up from the Airport
Morning 🏨Budget camping On Mt Kilimanjaro 🍽All meals included Drinking water (Other drinks not included)
This morning we will drive to the village of Nale Moru for the starting point of the Rongai route. The first stage of the trek is through farmland and pine forests. You may have chance to see the beautiful Colobus monkeys or if you’re lucky enough, elephants or buffalos en route. Our first camp will be the Simba Camp located at the edge of the moorland zone at 2625m.
Day 2 Rongai Gate(1950m) to 1st Caves Camp(2600m)
Morning 🏨Budget camping On Mt Kilimanjaro 🍽All meals included Drinking water (Other drinks not included)
The morning hike is a steady ascent up to the Second Cave Camp located in the moorland zone with superb views of Kibo and the Eastern ice fields on the crater rim. Distance covered: 5km / 3.1mi
Day 3 1st Camp Caves to Kikelewa Cave(3600m)
Morning 🏨Budget camping On Mt Kilimanjaro 🍽All meals included Drinking water (Other drinks not included)
Leaving the pine forest behind us carry on with a steady ascent walking though moorland. There are superb views of the Eastern ice fields on the crater rim of Kibo, the highest of the three volcanoes which form the mountain. We will leave the main trail and strike out across moorland on a smaller path towards the jagged peaks of Mawenzi, the second of Kilimanjaro’s volcanoes. We will set up camp today in the sheltered valley near Kikelewa caves at 3630m
Day 4 Kikelewa Cave to Mawenzi Tarn Camp
Morning 🏨Budget camping On Mt Kilimanjaro 🍽All meals included Drinking water (Other drinks not included)
This morning we have a short but steep ascent up grassy slopes which is rewarded by a superb view of the Kenyan plains to the north. We leave vegetation behind shortly before reaching our next camp at Mawenzi Tarn Hut directly below the towering cliffs of Mawenzi. This afternoon you have chance to rest or explore the surrounding area to aid acclimatization. Distance covered: 8km / 5mi
Day 5 Mawenzi Tarn Camp to Kibo Hut(4700m)
Morning 🏨Budget camping On Mt Kilimanjaro 🍽All meals included Drinking water (Other drinks not included)
We leave our campsite and cross the lunar desert of the ‘saddle’ between Mawenzi and Kibo After a couple hours trekking, reach this spectacular place, with the summit of Kilimanjaro in the background and our trail to the high camp stretched out before our eyes. Upon reaching our camp the remainder of the day will be spent resting in preparation of the final ascent after a very early night! Distance covered: 8km / 5mi
Day 6 Summit Attempt
Morning 🏨Budget camping On Mt Kilimanjaro 🍽All meals included Drinking water (Other drinks not included)
Today is “The Big Day” – the summit stage. You will begin your final ascent around midnight which will be long and strenuous. Passing the Hans Meyer Cave at 5220m, the climb slowly but surely goes upwards. At sunrise, you will reach Gillman’s Point (5681m) – the crater rim of Kilimanjaro – where the sun will slowly start to warm up the land. You will have soon forgotten the cold of the night and after a further hike of 1 – 2 hours, you will reach Uhuru Peak at 5895m. On your return to Kibo Hut, a warm meal awaits you followed by a 1 – 2 hour break before proceeding back down to Horombo Hut. Distance covered: 22km / 13.7mi
Day 7 Horombo Hut to Marangu Gate
Morning 🏨No accommodation (End of tour) 🍽Breakfast & lunch (Dinner not included) Drinking water (Other drinks not included)
The last stage passes through the heath and moor zone to the Mandara Hut (2700m) where a warm lunch is waiting for you. Soon, you will once again pass the tropical rainforest and after a total time of 6 hours trekking, you will be back at the Kilimanjaro National Park Gate (1860m). After saying goodbye to your mountain guides, a short transfer follows to take you back to your hotel in Moshi. Once there, you can take a warm and relaxing shower and celebrate your success in reaching the summit of the Kilimanjaro.

Rates

From: $1,750 pp (USD)
Final quote depends on date, travelers and lodge level.

No upcoming group dates found in database (group_climbs).

Inclusions

Included
  • Porterage
  • Rescue fee
  • Park fees (For non-residents)
  • All activities (Unless labeled as optional)
  • All accommodation (Unless listed as upgrade)
  • Camping equipment
  • A professional driver/guide
  • All transportation (Unless labeled as optional)
  • All Taxes/VAT
  • Pickup and Drop off to your hotel/Airport
  • Meals (As specified in the day-by-day section)
  • Drinks (As specified in the day-by-day section)

Exclusions

Not included
  • Climbing gear
  • International flights (From/to home)
  • Additional accommodation before and at the end of the tour
  • Bath towels
  • Tips (Tipping guideline US$10.00 pp per day)
  • Personal items (Souvenirs, travel insurance, visa fees, etc.)

Note: Some items may vary depending on season and lodge level.

Getting There

Start: Rongai Route

End: Rongai Route

We can arrange airport pick-up and drop-off. Ask in your quote request.

Offered By

USD Safaris & Tours
USD Safaris & Tours
4.9/5 • 1600 reviews